Stanton Station

Closure of the Bottom Ash Surface Impoundment was completed in July of 2020. Following completion of closure, the Bottom Ash Surface Impoundment is being monitored in accordance with the Post-Closure Care Plan. In alignment with a plan applicability review, some of the Design Criteria and Operating Criteria are related to operation of active CCR units and are no longer applicable.

Location Restrictions

Design Criteria

Operating Criteria (not applicable after closure)

Groundwater Monitoring & Corrective Action

Closure and Post-Closure Care

Retrofit (not applicable)

  • Initial Retrofit Plan
  • Notification of Intent to Retrofit CCR Unit