Stanton Station

Closure of the Bottom Ash Landfill was completed in July of 2020. Following completion of closure, the Bottom Ash Landfill is being monitored in accordance with the Post-Closure Care Plan. In alignment with a plan applicability review, the Operating Criteria are related to operation of active CCR units and no longer applicable.

Location Restrictions

Design Criteria (Not applicable)

  • Documentation of Liner Type
  • Initial Hazard Potential Classification Assessment
  • Emergency Action Plan
  • Documentation Recording the Face-to-Face Meeting or Exercise with Local Emergency Responders
  • History of Construction
  • Initial Structural Stability Assessment
  • Documentation of Corrective Measures Relating to Structural Stability Assessment
  • Initial Safety Factor Assessment
  • Design and Construction Plans for New or Lateral Expansion of CCR Unit

Operating Criteria (Not applicable after closure)

Groundwater Monitoring & Corrective Action