Stanton Station
Closure of the Bottom Ash Landfill was completed in July of 2020. Following completion of closure, the Bottom Ash Landfill is being monitored in accordance with the Post-Closure Care Plan. In alignment with a plan applicability review, the Operating Criteria are related to operation of active CCR units and no longer applicable.
Location Restrictions
Design Criteria (Not applicable)
- Documentation of Liner Type
- Initial Hazard Potential Classification Assessment
- Emergency Action Plan
- Documentation Recording the Face-to-Face Meeting or Exercise with Local Emergency Responders
- History of Construction
- Initial Structural Stability Assessment
- Documentation of Corrective Measures Relating to Structural Stability Assessment
- Initial Safety Factor Assessment
- Design and Construction Plans for New or Lateral Expansion of CCR Unit
Operating Criteria (Not applicable after closure)
Groundwater Monitoring & Corrective Action